Home Categories Send inquiry

Super Purchasing for Quick Coupling Camlock - Conduit Body – Donghuan

Electric fittings

From 2012 our factory begin to produce the electric fittings, at first we produce conduit body, including (LL,LR, LB,T) with malleable iron, then enlarge the other items. Now we can produce the Guat, bushing, EYS, Lt connector with lugs, lt connector without lugs, union, enlarger, close nipple, drain breather, cover, aluminum lugs etc. In the beginning we use the black sand mould to produce, then we improve step by step, now we all revised the new mould with yellow sand, the thread is maked by CNC machine. The surface we mainly make now is electric, but also can make with hot-dip galvanized firstly then electric. Also for the new item we also have the experienced to open the mould, if you are interested welcome to contact with us.

Usage

Conduit bodies are used to gain access to the interior of a raceway for wire pulling, inspection and maintenance where the raceway changes direction. Allows connection of straight conduit runs, branch conduit runs and 90° bends. The union used for joining conduits, or conduit to enclosures or other devices, without rotation of conduits, etc. Allows future access and removal of system components.

Types: Conduit fittings

Produce name  SIZE PACKAGE
LL 3/4,1,1-1/2,2 In small box then in big carton
LR 3/4,1,1-1/2,2 In small box then in big carton
LB 3/4,1,1-1/2,2 In small box then in big carton
T 3/4,1,1-1/2,2 In small box then in big carton
GUAT 1/2,3/4,1, In small box then in big carton
BUSHING 3/4,1,1-1/4,1-1/2,2,2-1/2,3,4 In small box then in big carton
UNION 3/4,1,1-1/2,2 In small box then in big carton
COVER 3/4,1,1-1/2,2 In small box then in big carton
LT CONNECTOR 3/4,1,1-1/4 In small box then in big carton

Material

1.Bodies---Malleable iron with electrogalvanized 2.Gaskets---Neoprene 3.Cover---Malleable iron or carbon steel 4.Cover Screws---Stainless steel 5. Size: 3/4’’-2’’ 6. Thread: NPT 7. Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD; 8. Packing detail: Packed in cartons then on pallets; 9. Delivery date: 60days after receiving 30% prepayments and also confirming samples; 10. Quantity tolerance: 15% .

  • Super Purchasing for Quick Coupling Camlock - Conduit Body – Donghuan Related Video: